FMCG / Industrial Liquids

Installed a high-speed automated filling and capping line designed for continuous operation and high output. The system delivers precise filling, secure sealing, and reliable performance with minimal downtime.

project details

Client: Jack Travol
Project Start: 24/04/2020
Product Required: 5900 Product
Investors Website: Topgear88.com
Client Location: Slovenija, Ljubljana
Value: 587.000$
Other: Your Custom

Brochure

Download our document to see specific data of the service and how we work.

BROCHURE.DOC
1.25M
BROCHURE.PDF
3.81M

Let’s Start Work
Together

Please feel free to contact us. We will get back to you with 1-2 business days. Or just call us now.

Project Description:

To meet high production demands, AUTO FILER installed a high-speed bottle filling and capping line capable of handling large volumes with precision. The system was designed for continuous operation with minimal downtime, ensuring reliable performance in demanding environments

Machines Supplied:

High-Speed Filling Machine
Engineered for rapid and precise filling, this machine supports high production volumes while maintaining consistent accuracy and smooth operation.

Multi-Head Capping Machine
Equipped with multiple capping heads to ensure fast, uniform, and secure sealing of bottles, ideal for high-output production lines.

Conveyor & Control Panel
The conveyor enables continuous bottle flow, while the user-friendly control panel allows easy monitoring, adjustment, and efficient operation of the entire line.

Key Benefits:

Our Approach And Solution

The $4 million project was successfully completed in two separate phases with both phases coming in on schedule and the overall costs coming in under budget. Emergency repairs to the facility were completed on December 11th, 2014 which allowed for the facility to operate through the critical winter months. Permanent electrical repairs along with less critical site deficiencies were completed in April and May of 2016 when a longer facility shut-down could be tolerated. In order to meet the required schedule, TransGas delegated procurement and construction management services to WSP.